The European railway network is changing constantly and no atlas can ever be completely up to date. To help readers keep up with the situation this page will list those changes and corrections that I am aware of, with the latest information shown at the top. Some very minor changes and certain changes too complicated to describe have been omitted. The date is the date the item was added - not the date of the event. If you have any information for this page please e-mail me at mail@europeanrailwayatlas.com - thanks!

 

28-07-10 Belgium: 36A2 delete Ruien and Ronse to Leuze branches. 36B1 delete Genappe branch. Show no heritage line service between Dendermonde and Baasrode-Noord. 36C1 delete Sombreffe branch. 37A2 delete Rocourt branch. 38C2 delete Westrozebeke branch. Insert location Glageon between Momignies and Anor. Freight branch is open between Anor and Glageon; rest of line to Mariembourg delete (& p30). Change name of Mariembourg 3 Vallees to Mariembourg Depot. 39B5 delete Bastogne branch and remove customs at Gouvy.
28-07-10 Italy: 81C1 Saronno to Saregno to be electrified, doubled and re-opened to passengers by 2012. 81A5 Parma to Fornovo; Berceto to Borgo; Pontremoli to Chiesaccia to be doubled by 2011. 84A2 Casano to Bracciano to be doubled. 84A3 Spoleto to 83A3 Campello sul Clitunno to be doubled. 81C5 alter opening date of Firenze Belfiore station to 06/2016. 84B4 Campoleone to Aprilla to be doubled. 84A2 Capranica to Orte has re-opened to freight. 86A4 Cancello to 84C5 Benevento to be doubled. 88A4 Giampilieri to Fiumefreddo to be doubled.
27-07-10 France: Correct spelling: 31A5 Haguenau (item18).
27-07-10 Switz: Correct spelling:
68B4 Kaiserstuhl. 71C4 change Felsenburg to Blausee-Mitholz.
27-07-10 Germany:
Correct spellings: 43B1 Schneverdingen, 53C5 Londorf, 54B4 Landrückentunnel (without "b"), 54C5 Bufleben, 54B2 Königshofen, 56B5 Altenberg, 58B4 Ottenhöfen, 59C3 Pfaffenhausen, 60B2 Miesbach, 59B2 Oberstaufen (& 62A1). Other things: 53A2/B2 There is a line from Altenglan via Lauterecken-Grumbach to Staudernheim that is used only for Rail Cycling (no regular traffic). 54A1 Change Öhringen to Öhringen-Cappel; from there to Heilbronn is now electrified. 54A1 Steinsfurt - Bad Friedrichshall-Jagstfeld is electrified. 54A1 Meckesheim (p53) - Aglasterhausen is electrified. 59B3 Change Warthausen to green, local trains now stop there. 59B5 Rudersberg - Welzheim will be used for heritage trains (steam and diesel) - starting this year. 59B5 Change Rudersberg to  Rudersberg-Oberndorf. 61C4 Add a station at Benningen a couple of km west or Marbach. Frome there to Freiberg is now double track, the bit to Marbach will stay single. 61B3 Add a station at Malmsheim between Renningen and Weil der Stadt; from Malmsheim to Weil is single track. 61B2 Böblingen - Sindelfingen - Maichingen will be re-opened for passenger trains (S-Bahn Stuttgart) during 2010. Maichingen - Renningen will follow 2011 or 2012.
15-07-10 Ireland: 9C1 Midleton branch now open to passengers.


All items below this line have been incorporated in atlases with an 01-07-10 version date...


29-06-10 Poland: 76A3 Pisz to Elk re-opened to passengers.
29-06-10 Italy: 80B5 Bornato-Calino to Rovato now open to passengers.
29-06-10 Czech: 95A4 Hodslavice to Novy Jicin branch closed.
29-06-10 Netherlands: 35A4 delete Steins branch. 35C3 delete Schoonebeek branch. 36A4 change Oudelande to Baarland and show as a station.
29-06-10 Hungary: The following lines will re-open to passengers on 4th July: 96B3 Komarom to Szeksefehervar; 96C2 Papa to Csorna; 98C2 Karcag to Tiszafured; 99A1 Kecskemet to Lajosmisze; 96C3 Zirc to Veszprem.
13-06-10 Netherlands: Veendam service now to start 4/11.
13-06-10 Poland: Passenger trains from 79A2 Jaslow to 79B2 Zagorz have been re-instated. 77C3 Klodzko Gl to Kudowa Zdroj replaced by buses (also 94B2).
13-06-10 Latvia: 114C2 Ventspils to Tukums2 passenger service has been withdrawn again. 115A3 Passenger service Gluda to 115A1 Liepaja in not daily - check timetable (also p116). Gluda to Renge replaced by buses (also p116). 114C4 Gulbene to 115A5 Plavinas also now not daily service.
13-06-10 Italy: 88A4 Patti-S.Piero to Fiumetorto to be doubled.
13-06-10 Hungary: 98B1 Szalajkavolgy now open to passengers (also 90B1). 97B4 Pecsvarad branch OOU (also 100B5).
13-06-10 Germany: 55B4 Hof to 55B5 Reichenbach to be electrified c2012.
13-06-10 France: 33A2 new link to be built between Avignon Centre and TGV stations. 29B3 Arreau branch de-electrified.
13-06-10 Belgium: 36C1 from just south of Namur the line will be converted to 25kV a/c all the way to Luxembourg (39B4) and there will be a north to south double track freight curve just north of 39A4 Libramont by c2014.
13-06-10 Austria: 64B3 new east to south freight chord to the east of Absdorf-Hippersdorf. 65C5 new freight chord now open east of Inzersdorf Ort (10).
04-06-10 Italy: 80B2 remove St Vincent station; 80C2 remove Castellamonte branch; 80C2 correct Aviglino to Avigliana; Remove Airasca to Saluzzo branch; 81A1 remove Bra to Ceva and Mondovi, also Dronero branch; 81A5 reduce Chiesaccia to 'other location'; 82A3 Tolmezzo branch OOU; 82B3 remove Pinzano to Casarsa line; 82C1 remove Dossobuono to Isola della Scala line; 82C1 remove Valdaro branch; 83B1 Firenza to Pistoia is double track; 83C1 remove Colle Vall d'Elsa branch; 83B2 Remove Fermignano/Urbino branch; 84A5 Line OOU south of Caldari; 84B3 Priverno branch OOU; 85C3 Remove Olbia Marritima; 85B1 Double tracking done south of San Gavino; 86C3 Bari to Bitonto doubled; 86C3 Polignano to Fasano doubled; 88A4 remove Alcantara to Randazzo freight line; 88B4 remove Paterno to Caracaci line;
04-06-10 France: The French pages have been extensively revised and some of the more important and easy-to-explain changes are: 25B5 Pontivy to Loudeac OOU; 25C3 line north of Rolleville OOU; Fecamp to St Vaast removed; 26C3 Caudebec-en-Caux OOU; 26C4 freight line east of Gournay-Ferriers OOU; Change name at end of the Vic-sur-Aisne branch to Ressons-le-Long; 26C4 remove line north of Envermeu; 26C5 remove Dieppe to Serqueux line; change name at end of Peronne branch to Eterpigny (in use); 26A1 remove Carvin branch; 26B1 remove Mericourt-sous-Lens branch; 26B1 remove Saulty-l'Arbret branch; 26B2 reduce Somain to Lourches to double track freight line; change Tunnel les Gouttes to Berjou; 27A3 remove Surdon east curve; 27A4 remove Etrepagny to Gissors line; remove Senonches branch; 27A5 remove Antill branch; 27B1 show Mauron branch OOU; show Chateaubriant to La Chapelle OOU; 27B2 change Fougeres to La Selle-en-Luitre; Chateau-Gontier and Louailles branches in use; change Couterne to Haleine; line east of Pre-en-Pail in use; 27B3 remove Malicorne-sur-Sarthe - whole line OOU; 27B3 Mondoubleu branch OOU; 27B5 Beaune-la-Rolande branch OOU; Pithiviers to Malesherbes OOU; Charney branch OOU; change Bellegardep-Quiers to Quiers-sur-Bezonde and show in use; 27C1 Paimboeuf branch in use; 27C2 change Bazouges to Durtal; 27C3 remove La Fleche to Luche-Pringe; remove Richlieu branch; remove line south of Le Bouchet; 27C5 change Beffes to Marseilles-les-Aubigny. 28A1 La Roche-sur-Younn to 27A2 Thouars is open to passenegrs, although most services are buses; 28A2 halve length of Melle branch and make terminal location Prahecq; 28A4 remove La Chatre to Aigurande; remove Le Blanc branch; 28B2 show Gemozac branch OOU; 28B4 show Bourganeuf branch in use; 28C3 Marmande to Casteljaloux (29A3) OOU. 29A1 remove Perentis and Mimizan branches, also Labouheyre to Marqueze; 29A2 remove Liposthey and Tartas branches; 29A3 shorten Mouchan branch about 8km, end of branch is now Condom; 29A5 change L'Hospitalet-du-Larzac to Ste Eulalie-de-Cernon. The velorail actually starts from La Bastide-Pradines, a few km east of Tournemire; 29B3 change Sarrancolin to Arreau and show branch in use; 29B5 Axat branch now extended a few km to St Martin-Lys; 30B1 shorten Bellignies branch slightly and change name to St Waast; 30C1 shorten Le Nouvion branch about 8km, change terminal to Boue and remve south curve at Busigny; 30C1 Sains-Richaumont branch OOU; 30C2 line OOU south of Stenay; 30C3 Tiercelet branch OOU; 30C3 Thionville (12) to Bouzonville 31A4) now feeigh only; 31A1 Montmirail branch reduced to freight status, heritage operation ceased; likewise Sezanne to Esternay; Angleur branch OOU; 31A3 remove east curve at Verdun; 31A3 remove eaast curve at Lerouville; 31A1 change Maron to Chaligny. Chaligny to Toul is OOU, Chaligny to Blainville is double track freight line; 31A4 Bitche to Niederbronn-les-Bains (13) OOU; 31A4 change key item 11 to Berthelming. From there to Sarre Union is OOU; 31A5 Alter item 17 to Wintersdorf. From there to Hagenau (18) is OOU; 31B1 Courtenay branch OOU; 31B2 change Dommartin-le-Franc to Dommartin-le-Chateau; 31B3 velorail at Andelot now all the way to Bologne; Coussey branch OOU; remove Port-d'Atelier to Aillenvillers branch; extend Anould branch, mark OOU and rename terminal to Fraize; Re-name La Vancelle to Liepvre and show in use; show Gerardmer OOU; Re-name Guebwiller to Buhl; 31C1 line extended a couple of km beyond St Saveur-Puisaye to Etang-de-Moutiers; 31C1 change Tamnay-Chatilon to Tamnay-en-Bazois; 31C3 remove Marnay branch; Devecey branch OOU; change Chemin-Perseux to St Aubin; 32A3 remove Bletterans branch; 32A4 Evian-les-Bains to St Gingolph OOU; 32B1 Change Puy-Guillaume to Paslieres; 32B2 Firminy to Dunniers OOU; remove Boisset branch; 32B3 Peyrieu branch OOU; Halve length of Villebois branch and make end of it Langnieu; 33A1 Anduze branch OOU; change Lodeve-le-Boxc to Le Bosc; change Montpellier to Montpellier-St Roch; 33A2 change Vezeonbres to Mas-de-Gardies; show Pernes-les-Fontaines line OOU - proposed velorail line; 33B1 delete Cazouls branch; 33B2 remove Mas-Thibert branch; 33B3 Bel-Air-le-Mede branch OOU; remove La Ciotat Ville branch; 33B4 Les Salins branch OOU; 33C5 change Chandieu-Toussiex to 'other location'; Brignais to Givors is single track.
04-06-10 Sweden: 1B5 Saltsjobanan is single track. 2B1 reduce Hallnas to 'other location'. 5C2 reduce Tillberga to 'other location' but add a station at Ransta abou 12km north. 6B5 Ornskoldvik to Husum open to freight and electrified.
04-06-10 Britain: 14C2 Fowey Docks added south from Lostwithiel. 14C3 Heathfield branch OOU. 15A5 Service suspended on Oldham loop pending 750V a/c overhead electrification and conversion to metro. 16A1 Hanworth branch OOU; Freight line north and east of Bolsover OOU; Rufford branch OOU; Page 13 etc, proposed High Speed 2 between London, Birmingham and Litchfield added; 13A3 Llandudno branch is double track. Following introduction of the new Grand Central Bradford to London service the line from 18C4 Bradford Interchange through Halifax, Brighouse, Wakefield Kirkgate and on through Pontefract Monkhill to Doncaster(167A1) can be shown as a passenger main line.
04-06-10 Norway: 5A1 reduce Kornsjo to 'other location'.
04-06-10 Finland: 6C5 change en of Pietarsaari branch to Alholma. Change end of Uusikaupunki branch to Hangonsaari. 
04-06-10 Ireland: 9A2 Ennis to Athenry and intemediate stations open to passengers. 
04-06-10 France: 66A1 reduce stations at Pont-d'Hery and Boujailles to 'other locations'. 70B1 show line in use as far as Ugine and remove Faverges.
04-06-10 Spain: 23C5 change Vallecas to El Pozo. Line from there to Villaverde is freight-only double track; from Villaverde to Humanes is double track. 23C4 change Grinon to 'other location'. 20B1 change Pajeras to 'other location'.
04-06-10 Slovenia: 100B2 correct Zajog to Zalog.
04-06-10 Croatia: 100C1 remove Rovinj branch and show Stalij branch OOU (also p 82).
05-03-10 Spain & Portugal: Spellings - 21A2 Leiria (twice) and 21A3 Caceres.
21-02-10 Slovenia: 100B2 The Kocevje branch is OOU but is proposed for reopening to passengers (also 82B5). 
21-02-10 Hungary: 96B2 Hegyeshalom to Raja passenger service reprieved (also 89A1 & 64C5).
21-02-10 Slovakia: 90C2 Lenartovce to Banreve and 91A3 Kechnec to Hidasnemeti closed to passengers (also page 98).
21-02-10 Czech Rep: 92A4 Dolni Poustevna to Sebnitz reopened (also 50B1).
21-02-10 Germany: Igel to Wasserbillig is single track. Will be doubled in 2011 (also 30C3 & 52C2).
21-02-10 Moldova: 109B2 There is a new (presumably single track) passenger line south from Cahul to a new station at Giurgiulesti in the extreme SW tip of Moldova. The line goes on, freight only, from there to join the Reni - Galati line. Not sure which way the junction faces at this point.
21-02-10 Romania: 107C3 There is a west to south freight curve avoiding Holod (also 102A4 & 99A4). 107C4 The line from Marghita should enter Sacuieni Bihor from the south end. There is also a south to east curve avoiding Sacuieni used by one passenger train a day (also 98C4). 111B5 At Slobozia Veche there is a south to east curve. The station should be at the southern end of the resulting triangle; the direct east to west part of the triangle is OOU. 111C5 The line south of Medgidia has been altered. It now joins the main line in a triangle junction between Medgidia and Dorobantu. Passenger trains thus enter Medgidia from the east end and there is a freight curve going east to Dorobantu. 108A2 show Brad to Paulis OOU (track largely stolen!). 108A2 Show a south to east passenger curve avoiding Simeria (single track?). 108A2 the Slatna branch leave Alba Iulia station from the north end. Barabant station is on the main line north of
Alba Iulia. 108C5 show Gura Putnei to Nisipitu line OOU (washed out and unlikely to reopen) also 118B1. 108C5 Siet branch closed & OOU (also 118C1). 108C5 Suceava Nord station should be at the NW end of the triangle (also 118C1). 108C1 Shorten Slanic branch by 10km and make terminal station Poiana Slanic. Poiana Slanic to Slanic is closed due to a failed bridge and will not reopen. 109A1 there is an east to north avoiding freight curve to the east of Buzau. 109A2 Panciu branch leaves from the north end of Marasesti station. 109B1 the Giurgeni branch leave from the south end of Tandarei station but is now OOU. 109A1 there is a south to north freight avoiding line to the east of Faurei. 109A1 just to the west of these two lines and connected to Faurei is an electrified test track. 109B3 Falciu Nord ststion should be Falciu. Falciu Nord is a short distance to the north, branching off from Falciu station.
21-02-10 Portugal: 21B1 Reduce Santa Vitoria -Ervidal and Torre Va to 'other locations'. 21B2 Change Bombel, Aguas de Moura, Pinheiro  and Torre de Gadanha from passenger stations to 'other locations'. 20C3 Passenger services suspended between Tua and Pocinho UFN. Bus replacement. 21A3 Change name Badajoz-Elvas to Caia.
21-02-10 Spain: 20B4 remove Astorga-Zamora-Salamanca-21A3 Placenscia disused freight line. 20B5 Reduce the old Burgos station to an 'other location', line through it to freight status and rename Burgos AVE to Burgos Rosa de Lima. 20B4 remove Valladolid - 22C1 Ariza disused freight line. 21C3 Remove narrow gauge freight line west of Huelva. 21B5 reduce Montoro to 'other location'. 21C4 remove south to east curve at Utrera. 21C5 rename main Malaga station to Malaga (Maria Zambrano). Reduce old line between Malaga and Cordoba to secondary status. 23A2 Halve length of Riba-Roja branch, delete Riba-Roja station and change name of terminal station to Xirivella-L'Alter. 23C1 Aguilas to Lorca is open to passengers (Cercanias services only - no RENFE).
16-01-10 Italy: 83A1 Bologna Central to 83B1 Firenza HSL is now open (also enlargement). On enlargement add a link from the HSL to the existing line just north of Firenze Castello allowing access from the HSL to Firenze SMN station. The new HSL line station (to be Firenze Belfiore) opens May 2014.
16-01-10 Great Britain: 14B4 line double tracked three miles either side of Axminster. Mark 18B4 Hayes to 17A1 Newbury, Oxford, 14A4 Bristol Temple Meads and 14A3 Swansea UE. Mark 15A3 Liverpool to 15A5 Manchester via Earlstown UE. Also the 15A4 St Helens Central line and Manchester to 15A4 Bolton, 12C4 Preston and Blackpool North.
02-01-10 Poland: Passenger trains from 79A2 Jaslow to 79B2 Zagorz have been suspended.

All items below this line have been incorporated into atlases with an 01-01-10 version date...


28-12-09 Germany: The following freight only lines can be deleted: 43B3 Hohenlockstedt branch; 43A1 Brockel branch; 44A3 Klutz branch and Hornstorf to Blankenberg; 44C3 Tribsees branch; 43C3 army base branch; 44C2 Robel branch; 44A1 Domitz branch; 44C1 Mirow to Wittstock; 45A1 Templin to Prenzlau; 46A4 Duisburg - Essen - Bochum electrified freight line; 46C5 Witten Ost branch; 46B4 Flandersbach to Wulfrath; 46C2 Vluyn to Hoerrstgen; Grefrath branch; Holte Heide branch; 47C5 Sulingen to Bassum; 47A3 Alstatte branch; Lutum to Steinfurt Burgsteinfurt; 47C2 Buren to Paderborn; Ruthen to Heidberg; 48A5 Bohme branch; 48B5 Gilten Ahlden branch; 48B4 Mullverladung branch; 48A3 Barntrup to Aerzen; Grohnde to Vorwohle; 48B3 Duingen heritage railway; 48C3 Schoppenstedt to 49A3 Helmstedt; 48C3 Hoppenstedt branch; 48A2 Borgholz branch; 48C2 Bad Lauterberg branch; 48A1 Korbach to Wega and the Hemfurth branch; 48C2 Bischofferode branch; 49A5 Luchow to Wustrow; Klotze to Oebisfelde; 49B5 Neustadt to Rathernow Nord; 49A3 Blumenburg to Eisleben; 49C3 Wiesenburg to 49A3 Gusten; 49C3 Niemegk to Treuenbrietzen; Neudersdorf branch; 49A2 Frose to Gernrode; 49B2 Stumsdorf to Zorbig; 49A2 Rolingen am see to Vitzenburg; 49B1 Meuselwitz to Altenburg; Porsten to Leipzig; Merseburg to Leipzig; 49C1 Grossbothen to Wechselburg; 50A5 Schmachtenhagen (13) to Fischtengrund; Tiefensee to Wriezen; 55B5 Thoringswerder branch; 50C5 Kustrin Kietz to Boossen; 50B4 Bad Saarow to Beeskow; 50B4 Eisenhuttenstadt to Peitz; 50C3 Guben to Forst to Weisswasser; 50B2 Caminau Kaolinwerk branch; 50C2 Weisswasser to Tuplice; 50A1 Riesa to Lommatzsch; 50B1 Konigsbruck to Strassgrachen; Arnsdorf to Durrrrohsdorf; Bautzen to Wilthen; 50C1` Grossschweidnitz to Oberoderwitz; 51B1 W-N curve at Wustermark; 51B5 Altlandsberg branch; 51A5 line north of Tiefensee; 52C5 Puffendorf branch (5); Siersdorf branch; Rearen to Kalterherberg; 52C3 Pronsfeld branch; 53B5 Rosenheim branch; 53C5 Helgersdorf branch; Breidenbach branch; Hatzfeld branch; 53A4 Ochtendung branch; 53C4 Wolfersheim to 54A4 Hungen - Laubach; 53A2 Oberthal branch; Freisen branch; Altenglan to Staudernheim; Weilerbach branch; Enkenbach to Ramsen; Drahtzug branch; Wendelsheim branch; 53C2 Guntersblum to Osthofen; 53C1 Herxheim branch; 54A5 Homberg branch; 54B5 Vachta branch; 54C5 Tambach branch; 54B4 Stabernach branch; 54B4 Wildflecken branch; 54C3 Ebern to Maroldsweisach; 54A2 Sandbach branch; 54C2 Ebrach branch; Demantsfurth branch; 55B5 Weida to Werdau; 55C5 Wechselburg to Penig and Kuchwald; Kuchwald to Neuoesnitz; 55A4 Probstzella to Ernsttahl; Steinwiessen to Kronach; 55B3 Lanzendorf branch; Kurort Jonsdorf (4) to As (Czech); Ernedorf Nord branch; 55C3 Waldsassen branch; 55A2 Heimhofen branch; 55B2 Vilseck branch; 56A5 Marienburg to Reitzenhainn; 57B5 Leipzig Leutzsch throgh Dolzig; 57C4 Leipzig Plagwitz through Gohrenz; 57B2 Frankfurt yard and associated line; 57C4 S-E curve at Engelsdorf; 58C5 Weil der Stadt to Calw; 59B5 Untergroningen passenger branch; 59C5 Monheim branch; 59A3 Albstadt branch; 59C3 Thannhausen branch; 59A2 Pfullendorf branch; 59B2 Weingarten branch; 60B5 Altmannstein branch; 60C3 Wasserburg Stadt branch; 61B5 Hauzenberg branch; 61A4 Passau to Obernzell branch; Tutting branch; 61B3 Enzweihingen branch; 61B3 Markgroningen branch. Some of theses closures need adding to pages for adjacent countries.
28-12-09 Germany: 43B3 Neumunster to Bad Segeburg open to passengers; 43C2 show Hollenbek branch open for rail cycling rather than a preserved railway; 45A5 Sassnitz branch closed to passengers; 61C4 Marbach to Freiberg to be doubled;
28-12-09 Hungary: Possible replacement bus services between 97A1 Szentgotthard and 96C1 Szombatheley until 2011.
28-12-09 Portugal: 20C2 Coimbra to Serpins branch OOU pending conversion to a metro line.
28-12-09 Czech Rep: 95C1 Satov to Znojmo now electrified and open to passengers (wrongly shown as freight only). Also p64A3.
28-12-09 Switz: 69B3 Trongen line to be modified to 1500V dc some time after 2012.
13-12-09 Romania: The following lines have lost their passenger service: 108B4 Sighetu Marmatiei to Teresava (Ukraine, also 118A2); 108C4 Gura Putnei to Nisipitu (also 118B1); 110A4 Golenti to Poiana Mare (also 103A5); 107B2 Jimbolia to Kikinda (also 99C2 & 102B3). Are these lines still open to freight?
13-12-09 Germany:
61C2 Wendlingen – 59A4 Kirchheim electrified.
13-12-09 Belgium:
34A5 Line open to passengers from Jette to Brussels Zuid via new station at Brussels Ouest (also 36).
13-12-09 Hungary: Passenger services are withdrawn on the following lines. Are these lines now OOU?: 96B2 Hegyeshalom-Rajka (also 89 and 64); 96B4 Esztergom-Almasfuzito (also 89 & 90); 96C4 Szekesfehervar - 96B3 Komarom (also 89); 97A1 Kormend-Zalalovo (also 65); 97B2 Somogyszob - 97A2 Balatonszentgyorgy (also 100); 97A4 Mezofalva-Paks (also 102 & 107); 96C4 Borgond - 97A4 Sarbogard; 97B3 Godisa-Komlo (also 100); 97B3 Pecs-Pecsvarad (also 100 & 102); 96B5 Galgamacsa-Vacratot (also 90 & 107); 98B2 Szilvasvarad - 98A2 Putnok (also 90 & 107); 98A3 Abaujszanto-Hidasnemeti (also 91 & 107); 98C2 Karcag-Tiszafured (also 107); 98C3 Sarand-Letavertes (also 107); 98B5 Fehergyarmat-Zajta (also 91, 107 & 118); 98B4 Kocsord also-Csenger (also 91, 107 & 118); 98C2 Ohat-Pusztakocs - 98B3 Tiszalok (also 91 & 107); 98A2 Kisszenas-Kondoros (also 102 & 107); 99A3 Korosnagyharsany-Veszto (also 107); 98B2 Hodmezovasarhely-Mako (also 102 & 107); 97A5 Lajosmizse (not shown, about 10km north of Hetenyegyhaza) - Kecskemet; 97A2 Balatonfenyves GV.- Somogyszentpal; 98B3 Nyiregyhaza - Balsa-Tiszapart (also 91 & 107); 98B3 Herminatanya- Dombrad (also 91 & 107); 97A5 Kecskemet KK - Kiskoros KK (also 102 & 107); 97A5 Kecskemet -Torokfai Kiskunmajsa KK (also 102 & 107). Additionally 96C3 Zirc-Veszprem has no passenger services Monday to Thursday. It is possible that some of these lines may turn out to have had a last minute reprieve.
13-12-09 Sweden: 1A4 Sodertalje Central branch is to be doubled. Also 1A4 Vasterhaninge to Tungelsta.
13-12-09 Latvia: Track lifted 114C2 Ventspils to 115A1 Liepaja (also 116) and 114C4 Ieriki to 114C5 Pytalovo.
13-12-09 Portugal: 21B2 Passenger services from Bombel to Evora and Beja suspended 5/10 to 5/11 for track work. Bombel to Evora will be electrified.
13-12-09 Italy: 82C2 Venezia to 82A4 Villach reduced to seconday status (also p63 & 100).
13-12-09 Czech Rep: 92C5 Milovice branch and 94C3 Sumperk to Zabreh lines electrified. 92B2 Kadan to Kastice and Radonice, residual passenger services withdrawn. 95C2 Hevlin branch has no weekend service and will close 06/10. 92A4 Rumburk to Mikulasovice via Pansky now has a weekends only passenger service. 94C1 Add stattion at Holice midway between Moravany and Borohradek. Holice to Borohradek closed to passengers and may be OOU. 95C5 Cesky Tesin to Ciesin (Poland) no passenegr service (also 78A2). 94C3 Mala Moravka branch closed. 92B5 Kopidlno to Dolni Bousov, residual weekend service withdrawn. 94C2 Dobruska branch closed.
13-12-09 France: 27C2 Thouars to 28A1 La Roche-sur-Yon, no passenger service; line though to be OOU. 27B4 Chatres to Orleans to be reopened to passengers - no date set.
13-12-09 Austria: 64B2 Krems a d Donar to 64B1 St Nikola-Struden, no passenger service. May be OOU? 64A2 Waidhofen a d Thaya to Waldkirchen a d Thaya OOU (also 93B5). 64C5 Neusiedl to Wulkaprodesdorf now electrified (also 96B1).
13-12-09 Poland: 79B2 Rzeszow to 79A3 Tarnobrzeg open to passengers again. 79B2 Munina to 79B3 Zwierzyniec bustituted. Also 79B3 Stalowa Wola Poludnie to 79C4 Zamosc and 79C4 Rejowiec. 79B3 Przeworsk avoider closed to passengers. 78B4 Chorzew Siemkowice to Herby Nowe now freight only. 78C5 No passenger trains on Koluszki avoiders. 75B4 Limited summer passenger service Szymankowo to Nowy Dwor Gdanski.
22-11-09 Italy: 80C3 & 81C1 Novara to Milano HSL open 12/09.
28-10-09 Sweden: 5B1 Otterbacken branch lifted. 5B1 Gardsjo only has a platform on the Lyrestad line, so the effective junction for changing trains is at Laxa. 5A1 Kornsjo station has no passenger service. 2B1 Hallnas station has no passenger service.
20-10-09 Switzerland: 71C2 Change colour of Zermatt to Gornergrat line to blue with note 725V a/c. Also, only the section south of Riffelberg is double track. 72A4 Change colour of Kleine Scheidegg to Jungfraujoch line to blue with note 1125V a/c.
17-10-09 Poland: 79A3 Kolbuszowa to Tarnobrzeg to re-open to passengers 12/09 (check!)
05-10-09 Austria: 64C4 Show UE north of Eisenstadt in red - to be 25kV (also 96B1).
05-10-09 France: 26B4 Boulogne to Rang-du-Fliers UE (also 17C4). 
05-10-09 Italy: 86A4 Mugnano to Aversa Centro open to passengers. 
05-10-09 Italy: 82C1 Poggio Rusco to Nogara now double track.
05-10-09 Hungary: 96B3 passenger service withdrawn again between Komarno and Komarom (also 89C1).
05-10-09 Lithuania: 115A2 Mazeikiai to Renge OOU.
05-10-09 Kaliningrad: 115C2 Chernyakhovsk to Zheleznodorozhny and Sovetsk closed to passengers (Also 76A5).
04-10-09 Turkey: The Carsamba line was re-gauged to 1435mm standard gauge about 20 years ago!
04-10-09 Spellings: 49B2 Delitzsch;  15A4 Earlestown.
04-10-09 Poland: The following lines have lost their passenger services:- 76B4 Elk to 76A4 Mragowo; 77B4 Legnica to Jerzmanice Zdroj; 77A4 Luban to 77A4 Zgorzelec; 79A2 Debica to 79A3 Tarnobrzeg. 
04-10-09 Greece: 106B2 Korinthos to Nafplio and Tripoli has re-opened. Also, Kiato to Patra is now closed for conversion to 1435mm gauge until mid to late 2010.
04-10-09 Austria: 63B2 Krimml line now expected to open by summer 2010.
04-10-09 Bulgaria: 111B4 Kardam to Negru Voda seems to have lost its passenger service again.
04-10-09 Czech Rep: 95B2 Blazovice to 95A3 Prerov to be double track by 2015.
04-10-09 Italy: 86B1 Station re-opened at Lucera and new passenger service from Foggia. Branch electrified. 
04-10-09 Sweden: 1A5 Nykvarn to Ryssjobrink to be doubled.
04-10-09 Germany: 53C1 Germersheim to 58C5 Worth UE.
04-10-09 Portugal: 21A2 Coruche station re-opened with passenger service to Setil. 
29-09-09 Switzerland: 67C2 Wasen im Emmenthal branch OOU. 
29-09-09 Poland: 76A1 New passenger services introduced Warszawa - Piaseczno - Gora Kalwaria (station re-opened) - Pilawa to the south of Warszawa. 
29-09-09 Italy: 86A4 Remaining section of HSL north of Napoli to open 12/12.
29-09-09 Germany:
52C5 Lindern to 46C1 Heinsberg to re-open to passengers 2012.
29-09-09 Germany: 52C5 Alsdorf to Stolberg to re-open to passengers 2010. Weisweiler to Langerwehe is now open to passengers. 
29-09-09 Austria: 65A1 Selzthal to 64C1 Kleinreifling - passenger services withdrawn. Bus replacement. 
29-09-09 Belgium: Where the new HSL line north of Antwerpen crosses uner the classic route show the interchange station of Antwerpen Luchtbal. Also, about 20km north of Antwerpen on the HSL show a station at Noorderkempen. 
28-09-09 Spain: Show a station at Baina a few km north of Ablana on the line to Trubia. The line from Baina to Trubia is now freight-only. 
23-09-09 Europe: There is a very good vebsite listing European rail-cycling venues at www.draisinenfahrten.de/links.html
26-08-09 Romania: 108B4 the Wassertalbahn narrow gauge system which had been OOU due to flood damage is now at least partially open again - http://www.cffviseu.ro/en/fahrplan.html 
11-08-09 Poland: 74B1 Lwowek narrow gauge branch lifted. 
08-09-09 Italy: 83B1 Correct Incisa to Figline Valdano. 
02-08-09 Poland: 78C5 Tomaszow to Skarzysko passenger service withdrawn.
02-08-09 Lithuania: 115B3 Gaiziunai to Palemonas passenger service withdrawn.
27-07-09 Poland: 74C1 rename Srem to Jerka.
24-07-09 Britain: 12C4 Morecambe (spelling)
14-07-09 Britain: 10A5 Glasgow Queen Street (misprint).
14-07-09 Germany: 49C4 Brandenburg (spelling).
02-07-09 Poland: 74B4 Mielno Koszalinskie open to passengers again mid-summer only. 

All items below this line have been incorporated into extract atlases with a 09-06-09 version date and full atlases with a 01-07-09 version date...


07-06-09 Britain: 11B3 show Alloa station as open (has been open for over a year!). Show new station at Laurencekirk, about 10 miles north of Montrose (11A4). 
07-06-09 Britain: 13B1 add University station between Birmingham NS and Longbridge. Upgrade 14A5 to 14A4 Newport to main line status (Nottingham to Cardiff Cross-Country route). 
07-06-09 Netherlands: Upgrade 35B2 Zwolle to 35B1 Zuthphen, 37B5 Nijmegen to 36C4 Tilburg and 36C4 Breda to 36B4 Roosendaal to main line status - also on p30 (Zwolle to Roosendaal inter-city service). 
07-06-09 Belgium: Change 36A1 Mons to Quevy to secondary and Mons to Quivrain to main line. Also 36A1 Tournai to 38C1 Lille to main line (also on p30)
07-06-09 Spain: 20C5 Colmenar Viejo (1) to 20B5 Burgos reduces to secondary status - very limited service. Also 32C2 Sevilla to Huelva Termino; 32B5 Linares-Baeza to Cordoba; 21C5 Moreda to 21C4 Algeciras reduced to secondary. 
07-06-09 Spain: 23B1 Lorca-Sutullena to Aguilas has no passenger service. Unsure if this section is open to freight. 
07-06-09 Spain: 23B2 Show a triangle junction to the south of Alcantarilla. The daily Talgo from Lorca-Sutullena uses the south side to run direct to Murcia del Carmen (only train on the Lorca line). The West to north side of the triangle is freight only. 
07-06-09 Spain: Reduce Alquerias-Santomera (23B2) and Chinchilla (23B1) stations to 'other locations' and remove Moixent (23A2) - seem to have no passenger service. Rename Elx/Elche station (23B2) to Elx Parc. 
07-06-09 Romania: 111A5 Rename Bucuresti 23 August station to Bucuresti Titan Sud.
07-06-09 Spain: 20B2 Redondela to A Coruna now undergoing electrification (UE).
07-06-09 Italy: 81C1 Novara to Milano HSL opens 12/09. Also 83A1 Bologna to Firenze HSL. 
06-06-09 Germany: 59B2 Eletrification between Buchoe and Lindau will be via the Memmingen route, not via Kempten as shown. 
06-06-09 Germany: 48A1 Rename Obervellmar station to Vellmar-Obervellmar. To be a new freight curve east from there direct onto the line towards Eichenberg and Gottingen. 
06-06-09 Please note that my postal address has changed to: European Railway Atlas, P.O. Box 2335, Wrexham, LL11 0HE, Wales, UK
04-06-09 Portugal: 20C2 & 3 Regua to Vila Real and Livracao to Amarante services suspended. 
31-05-09 Finland: 7C3 At Imatra the line from Svetogorsk actually joins the main line to the north of Imatra station and cannot be seen from it. 3A2 Branch into Elijarvi is from the north, not the south. 7B4 at Pieksamaki there is a north to east freight avoiding line. 7A2 at Kerava there is an east to north curve coming off the line from Skoldvik. 7B2 Change status of Juurikorpi to 'other location'.
17-05-09 Finland: 7B2 add south to east freight-only curve to the east of Kouvola. 3B1 at Kontiomaki there is an east to west freight chord.  3B3 Kemijarvi station is located at the north end of a traingle, off the main trrough line to Russia. 3A2 Insert a new station at Tornio-Itainen on the east to north chord of the Tornio triangle. Insert west to north freight chord at Murtomaki. Insert west to south freight chord at Tuomija. 7B5 at Siilinjarvi the line from Viinijarvi enters the station from the north end. There is there also an east to north chord avoiding the station. Freight line south of Lappeenranta OOU.
14-05-09 Germany: Tourist railbus service introduced between Buchenbeuren and Morbach. Intended to extend service to Hermeskeil. Line now labelled 'Hochwaldbahn'. 
14-05-09 Germany: 52C3 Gerolstein to 53A3 Kaisersech now marked as private railway (also 39C5). Website now www.eifelquerbahn.de 
10-05-09 Netherlands: 35A1 Insert additional station at Veenendaal De Klomp between Maarn and Ede-Wageningen. 
10-05-09 Netherlands: 35B1 Change Zutphen to Zwolle to main line. 36B4 Change Roosendaal to Breda and 36C4 Tilburg to 37B5 Nijmegen to main line (This reflects the Roosendaal-Nijmegen-Zwolle I/C service). (Also page 30).
10-05-09 Belgium: Add station at Herstal about midway between Liege and Liers.
10-05-09 Belgium: 36A1 change Mons to Quevy to secondary and Mons to Quieverain to main line. Change Tournai to 38C1 Lille to main line and Tournai to 38C2 Mouscron to secondary (Also on 30B1).
06-05-09 France: 27B5 Add freight single line between Pithiviers an Malesherbes. Also 27C2 Thouars to just south of Loudun. 
06-05-09 France: 24C3 Add double track electrified freight curve from Bobigny yard round toward Le Bourget yard.
06-05-09 France: The following freight lines are OOU: - 26B5 Bruay-en-Artois branch. 26B1 Mericourt-sous-Lens branch. 26A1 Carvin branch. 26A2 Halluin and Wattrelos branches. 26C5 St Leger, Doullens and Peronne branches. 27A2 Tunnel les Gouttes branch. 27B2 Pre-en-Pail and Louailles branches. 27C1 Paimbouef branch. 27C2 Chinon to Loudun. 30C1 Le Nouvion branch. 
06-05-09 France: Re-name Bavay to Bellignies. 
06-05-09 France: Add Caffiers station between Calais-Frethun and Marquise-Rinxent.
05-05-09 France: I have downgraded the following lines to secondary status - 26B4 Boulogne to Calais; 26C5 Amiens to 26B5 Arras (also enlargement); 27C3 Connerre-Beille to Chatres to Paris; 27C1 Nantes to 28A1 La Rochelle to 28C2 Bordeaux; 29A4 Toulouse to 29B2 Tarbes; 28C2 Coutras to 28B4 Limoges; 27A5 Gretz-Armainvilliers to 31B1 Troyes to 31C4 Belfort; 27B5 Moret-Veneux-les-Sablons to 31C2 Montbard; 27A5 (Paris) to Esbly to 31A1 Epernay to Reims / 31A2 Chalons-en-Champagne to 31A3 Lerouville to 31A3 Onville / 31A3 Nancy; 31A3 Nancy to 31A4 Reding; 31A3 Toul to 31C2 Dijon to 32A3 Louhans; 32C2 Grenoble to 32B3 Montmelian.
01-05-09 Sweden: 8A4 Double track through Falkenberg now complete. Locations Torebo and Heberg can be deleted. (also on 41B5).
   

All items below this line have been incorporated into revised atlases with a 28-04-09 version date....


27-04-09 Bulgaria : 110C2. The arrangement at Mihaljovo is wrong. The station is north of the point shown and lines split south to Dimitrovgrad and west to Plovdiv – i.e. there is no direct routing from Plovdiv to Dimitrovgrad.
27-04-09 Bulgaria : 111B4 Poveljanovo to Devnya is electrified.
27-04-09 Portugal : 21A3. Alter ‘UE to Covilha’ to ‘UE to Guarda’.
27-04-09 Italy : 83B5 show Firenze Porta al Prato as a passenger station with the branch to F.Cascine as a passenger line (still single track?). No - double track, secondary, electrified.
27-04-09 Croatia : 100B1 Lupoglav to C1 Labin line OOU.
27-04-09 France : Double track electrified chord being built east of Arras linking the Lens and Douai lines.

14-04-09 Britain : Travel information page. Please note the Rail Europe have now changed their details to: Rail Europe (www.raileurope.co.uk/). 1 Regent Street (Lower), London , SW1 4XT . Tel: 0844 848 5 848. 
14-04-09 Germany : 53B4 Siershahn to Grenzau now a steam heritage railway (www.brexbachbahn.de/). 
13-04-09 Britain : 14A3 Gwaun-cae-Gurwen branch in use. 
13-04-09 Britain : 13A1 Brownhills branch OOU.
13-04-09 Britain : 11C2 Giffen branch added. Name of junction at Lugton added. 
13-04-09 Britain : 13B3 Add a new station at Beddgelert a bit less than half way from Rhyd-ddu to Porthmadog. Rhyd-ddu to Beddgelert is now open to passengers. 

All items below this line have been incorporated into revised atlases with a 12-04-09 version date....


29-03-09 99A3 Hungary: Bekescsaba to Lokoshaza to be double tracked. 
25-03-09 94B1 Czech Rep: Trutnov to Zacler passenger service withdrawn again. No date yet for introduction of a Trutnov to Lubawka service (also 77B4).
24-03-09 36A4 Netherlands: Sloehaven port line electrified with a new link to the main line further west. Has the original line closed?
24-03-09 18C4 England: Moorgate service from St Pancras withdrawn following closure of the terminal platforms from Farringdon (not shown). The station remains open as the terminus for trains from Finsbury Park.
23-03-09 78B2 Poland: Passenger services withdrawn between Bielsko Biala and Skoczow.
23-03-09 20C2 Portugal: Pampilhosa to Figuera da Foz. Service suspended indefinitely with bus replacement during line upgrade.
23-03-09 81A5 Italy: Move Mediopadana (item 8 - name confirmed) station a little east so that it forms a bi-level interchange with the branch from Reggio Emilia. 
15-03-09 48A1 Germany: Most N-S high speed trains by-pass Kassel on the direct line, only calling at Wilhelmshohe.
08-03-09 18A3-18C2 England: Reading to Redhill downgraded to secondary status.
27-02-09 75A4 Poland: The railway museum at Koscierzyna has closed. 

All items below this line have been incorporated into revised atlases with a 12-02-09 version date....


12-02-09 France: 29B1 St Jean Pied de Port line de-energised. (Electrification equipment remains in place for now).
12-02-09 France: 28C1 Bordeaux St Louis re-named Bordeaux Ravezies.
12-02-09 Austria: Thorlerbahn, the Au-Seewiesen branch, lifted. 
10-02-09 Denmark: 40C2 Fredericia to 40C3 Arhus is NOT electrified.
09-02-09 Netherlands: The following stations in Friesland have been re-named: Grouw-Irnsum to Grou-Irnsum; Hardegarijp to Hurdegaryp.
09-02-09 Netherlands: There is no through track connection between Dutch and German systems at Enschede (Also page 47A4).
09-02-09 Germany: Selb Plossberg (4) to As OOU. (Correct on 92B1).
09-02-09 Bulgaria: 111B4 Kardam to Negru Voda (Romania) open to passengers with a limited service. I presume both border stations are subject to customs controls as neither state has yet implemented Schengen.
09-02-09 Belgium: 38C5 Show Mariembourg to Momignies OOU and in black. Momignies to Anor is open to freight. (Also page 30C2).
09-02-09 Lithuania: 115C3 Line south of Marchinkonys OOU. (Also 116B3)
09-02-09 Austria: 63A2 Waldkirchen to Slavonice lifted but proposed for re-instatement (Also 93B5).
09-02-09 Austria: 65A1 Selzthal (spelling).
08-02-09 Czech Rep: 56A2 Line SE from Plzen through Nezvestice should be single track. 
08-02-09 Czech Rep: 56A2 Kozolupy to Pnovany now double track (Also 92C2).
08-02-09 Poland: 92A5 Passenger service re-instated between Zgorzelec and Luban. 
08-02-09 General: Indication of border customs removed from border stations between fully implemented Schengen states: Austria, Belgium, Czech Republic, Denmark, Estonia, Finland, France, Germany, Greece, Hungary, Italy, Latvia, Lithuania, Luxembourg, Netherlands, Norway, Poland, Portugal, Slovakia, Slovenia, Spain and Sweden. 
08-02-09 Spain: 20A5 Mark Orejo to Aranguren and Cabezon de la Sal to Infiesto UE. 
08-02-09 Spain: 21C5 Marquesado OOU and no longer electrified.
08-02-09 Spain: 23C1 Almeria line no longer electrified.
08-02-09 Spain: Teruel (spelling)
08-02-09 Spain: 21B5 Valdepenas, 21C5 Guadix (misprint)
08-02-09 Poland: 74B4 Passenger services withdrawn from Mielno Koszalinskie branch.
08-02-09 Poland: 77C3 Klodzko Glowny to 77B4 Walbrzych Glowny - passenger services restored.
08-02-09 Poland: 78C2 Add Nowy Sacz Miasto a very short distance north of Nowy Sacz. Passenger service restored.
08-02-09 Poland: 75B3 Kwidzyn to Grudziadz re-opens to passengers from 01-03-09.
08-02-09 Greece: Larisa to Domokos now electrified although electric traction not yet in use on this section.
08-02-09 Italy: 83B1 Pistoia to Montecatini to be doubled & Montecatini T-M station to be rebuilt undergrond and re-named Montecatini Centro. 
08-02-09 Germany: 53B5 Add station at Gummersbach, about 5km north of Dieringhausen. Track to be doubled between those points by 12/2013. 
08-02-09 Germany: 47B1 Marienheide to Meinerzhagen to re-open to passengers c2013.
08-02-09 Croatia: 102B1 Osijek to Vinkovci re-opened to passengers. Show Ostrovo as a passenger station. Also 97C4.
08-02-09 Croatia: 100B4 Sunya to Novska electrified.
08-02-09 Portugal: 20C3 Show Barca de Alva as a proposed station. Line from Pocinho to be re-opened. 
08-02-09 Belgium: 36B3 Just north of Mechelen add Mechelen-Nekkerspoel station. Also N-E freigh curve from there to the Leuven line.
08-02-09 France / Belgium: 30B1 No passenger service from Aulnoye (6) / Maubeuge (5) to Quevy. Also page 36A1 & 38B5.
08-02-09 Switzerland: 70C4 delete Ouchy.
08-02-09 Switzerland: 68C5 Thayngen (misprint)
07-02-09 Germany: 53B2 Drahtzug branch lifted.
07-02-09 Germany: 50A2 Add pink 'H' symbol to Muhlberg branch.
07-02-09 Germany: 50C1 No passenger trains Siefhennersdorf (item 8) to Eibau. Replacement bus. Also 92A4. 
07-02-09 Germany: 47B2 Add pink 'H' symbol to the Neubeckum - Lippstadt - 47C2 Warstein line. 
07-02-09 Germany: 44B1 Putlitz branch open to passengers.
07-02-09 Germany: 61B2 Add location Sindelfingen a few km (about 7mm!) north of Boblingen. There to Renningen now double track.
07-02-09 Germany: 53C1 Meckesheim to 54A1 Eppingen electrified.
07-02-09 Germany: 46C1 Ratheim branch OOU. Also 37B3.
05-02-09 Spain: 21B4 About 15km north of Cerro Muriano add a location at Puente Nuevo (power station). Add station at Almorchon, just west of Cabeza de  Buey, where the freight line branches off. From there to Puente Nuevo is open to freight.  
05-02-09 Spain: 20B2 Vigo to Pontavedra is being double tracked. Add station at Padron, 20km north of Villagarcia. Padron to Villagarcia to be doubled. 20A2 Add Cerceda station about 15km north of Gorgullo. That section is now double track
05-02-09 Spain: 21B5 Where the Linares freight line branches off add a station, Vadollano. From there to Linares-Baeza is now double track. 
05-02-09 Spain: 22A1 Basque Y HSL and 20B4 Leon to Pola HSL will be 1435mm standard gauge.
05-02-09 Portugal: 21C1 Barreiro branch electrified.
05-02-09 Portugal: 21C1 lines to Universidade de Caparica and Cacilhas now open. 
05-02-09 France: 29C5 Add link from the HSL from Perpignan to a point on the existing line south of Figueras. This HSL from Perpignan will open first. The section from Figueras to Barcelona will open later. 
05-02-09 France: 27A3 Lisieux to Trouville now single track. 
05-02-09 France: 28B1 Heritage line to La Tremblade now re-opened. 
05-02-09 France: 27C1 Nantes to 28A1 Les Sables electrified.
05-02-09 France: 33B3 Marseilles to Aix re-opened. Unknown which bits have been double tracked. 
05-02-09 France: 26B2 On line east of Somain at the extreme edge of the enlargement add a station at Raismes. There is a test track just to the south of this station. 
05-02-09 France: 33C5 Add station at Chandieu-Toussieu between St Priest and Heyrieux. Current change is between the Chandieu and Heyrieux. 
05-02-09 France: 33C5 On the non-electrified line out of Lyon going NE towards Bourg-en-Bresse, a station is added just to the north of the LGV line: Les Echets. 32B2: About 25km SW of Bourg-en-Bresse show a station at Villars-les-Dombes. Line between Les Echets and Villars is now double track. Les Ecets to Sathonay still to be doubled. 
04-02-09 Italy: 86B4 Pompei Scavi to Moregine is single track.
04-02-09 Italy: 84C4 Re-name Salone station to Lunghezza. From there to Guidonia to be doubled. 
04-02-09 Italy: 86B2 San Menaio branch extended a few km eastwards to a new station at Peschici-Calenella.
04-02-09 Italy: 86C3 Bitonto to Taranto now double track throughout. Bari to Bitonto still to double (correction).
04-02-09 Italy: 82A1 Poggio Rusco to 83A1 San Felice double tracked. Poggio Rusco to nogara to be doubled. 
04-02-09 Italy: 83A1 Bologna to 83A2 Portomaggiore now electrified.
04-02-09 Italy: 80C3 Vercelli to Casale Monferrato is not electrified. 
03-02-09 Belgium: 37B1 Vennbahn lifted south of Sourbrodt to Trois Ponts and Losheimergraben. Add location at Kalterherberg just on the German side of the border. Rail-cycles available between there and Sourbrodt. Also on page 52. 
01-02-09 Ukraine: 121B4 Alchevs'k to 121B5 Luhans'k electrified. 
01-02-09 Ukraine: 121A5 Kindrashivs'ka-Nova to 121C5 Dovzhans'ka closed to passengers. 
01-02-09 Ukraine: 121C4 Mochalyns'kyi to Beschyns'ka closed to passengers. 
01-02-09 Ukraine: 121C1 Krasnoarmiis'k - Legendarnaya - 120B2 Dubove closed to passengers. 
01-02-09 Ukraine: 121B3 Popasana to 121A2 Kramators'k closed to passengers. 
01-02-09 Ukraine: 121B1 Dobropillia branch closed to passengers. 
01-02-09 Ukraine: 119C2 Kremenchuk to Korystivke electrified. 
31-01-09 Spain: 21C4 Alora, 21C5 Granada, 21A5 Ciudad Real (misprints). Corrected on later CDs. 
29-01-09 Hungary: 96C3. Add location at
Franciavágás about 15km east of Papa. Line from there to Kornye is OOU.
29-01-09 Hungary: 97C3. Add location at
Drávafok about 10km west of Sellye. Line from there to Kozeprigoc is OOU.  
29-01-09 Hungary: 97C3. Add location at Vajszló adout 10km east of Sellye. Line from there to Harkany is OOU.
29-01-09 Hungary: 96C3 Rename Berhida to Papkeszi. Line south from there to 97A3 Lepseny is OOU.
29-01-09 Hungary:
98B1. Mátramindszent to Recsk-Parádfürdő is OOU.
29-01-09 Hungary:
96B4. Márianosztra branch now open.  
29-01-09 Bulgaria: 111A4 Preslav branch OOU.
29-01-09 Bulgaria: 110B2
Panagjurishte branch re-opened to passengers.
29-01-09 Bulgaria: 111B3 Pomorie branch OOU.
29-01-09 France: 31B1 Add location
Villeneuve-l’Archevêque 7km west of Aix-en-Othe. Line from there to Sens is lifted.
29-01-09 Serbia: 102C3 Beograd western avoider now shown electrified.
29-01-09 Serbia: 103A4 Stalac to Krusevac now electrified. 
28-01-09 Austria: 64B4 Heritage trains over Korneuburg to Ernstbrunn line (www.erlebnisweltbahn.at/de/ErlebnisWeltBahn/Nostalgie/index.jsp)
28-01-09 Austria: 62B5 Is Traun to Wels open to passengers?
28-01-09 Czech Rep: 95A1 Heritage line at Pribyslav closed. 
28-01-09 Czech Rep: 95B3  Freight only line Klobouky u Brna - Zdanice shortened to Uhrice u Kyjova (about half way along branch)
28-01-09 Czech Rep: 95C2 The Lednice branch is now a heritage railway with steam trains (Also on 89A4). 
28-01-09 Czech Rep: 93A3 Tabor to Plana nad Luznici (not shown, a few km south of Sezimovo Usti) now double tracked. 
28-01-09 Czech Rep: 92C5 Heritage charter trains on Mochov branch in the summer. 
28-01-09 Czech Rep: 95B2 Pohorelice branch closed (also on 64A4).
28-01-09 Czech Rep: 94B2 Kralovec to Lubawka closed to passengers (see also 77B4) and Kralovec to Zacler reopened to passengers. 
28-01-09 Czech Rep: 93B4 Ceske Budejovice to Nové Hrady (not shown, midway between Borovany & Ceske Velenice) now electrified. See also 64A1 and 61C3. 
28-01-09 Poland: 78A3 Change Kiertz to Kietrz (spelling). 
28-01-09 Poland / Czech: 78A2 Chalupki to Bohumin open to passengers. See also 94C5 for the Czech map. 
28-01-09 Latvia: 114C4 no passenger service on Ergli branch, believed OOU.
28-01-09 Estonia: 114A5 Auvere to Musta closed. 
28-01-09 Denmark: 41A2 Vipperod to Lejre (41B4 inset) to be double tracked. 
26-01-09 Britain: 16C1 Kettering North Jc to 16B2 Manton Jc should open to passengers as is Corby station around February (Awaiting rolling-stock for the service). Note: Very limited service north of Corby.
26-01-09 Britain 16B1: East Midlands Parkway station open.
25-01-09 France: 27A4 Gisors to 26C4 Serqueux. Service replaced by buses indefinately due to track condition. Weblink 
19-01-09 Lithuania: 115B1 Klaipeda to 115B2 Pagegiai open to freight throughout and to passengers to Silute. (Line is also shown on page 116).
19-01-09 Sweden: 5C4 Ljusdal to 6C3 Hudiksvall is de-electrified. 
19-01-09 Sweden: 6B5 the first stretch of the Botniabanan, between Örnsköldsvik and Husum, has now been brought into use for freight.
18-01-09 France 28A3 Junction station for the Civray branch is St Saviol (name missing).
18-01-09 France 28A5 Montluçon to Eygurande is closed to passengers. Freight situation unknown.